page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
page 186
page 187
page 188

156 www. bus- ex. com NOVEMBER 09 cross the two new lanes now under construction to get access to the old bridge side. So there are challenges with the geometric layout of the job." The crew has built a falsework deck, and services ( such as power lines, sewage pipes, etc.) have to be relocated from the old bridge to the new one. " And since we're not in the same footprint," Malowiecki says, " those services have to be fully installed on the new bridge before we can decommission the services on the old bridge, which requires detailed service staging on both sides of the road. Some of the timing is beyond our control, as the service authorities have to do the final connections. The staging of the job is complicated, compounded by switching the traffic over." A lot of the roadwork is built over marine mud in various areas, so stabilization piles are used, as well as pre- loaded earthworks. A lot of the project is dependent on how those settlement earthworks go. " We have to monitor the settlement to determine the timing of follow- on works." Another complication, he notes, is that the area is known for its relatively complex geotechnical material, which has been detected during the construction of other bridges built over the Pioneer River in Mackay. " The ground has very hard rock material interspersed with weaker layers and vertical dykes," says Malowiecki. " So we have piles immediately adjacent to each other pulling up at considerable distances apart. We also knew that it would be a complex geotechnical job, so the piling is really difficult." There's also an existing sewer line running alongside the old bridge, which converts to asbestos pipe in fairly poor condition when it leaves the bridge

This bridge is in an environmentally sensitive area, mainly because the river flows out to the Great Barrier Reef. Therefore, there are many restrictions on what can be done in the river. The crew performs continuous monitoring of the water quality and has designed its construction processes to avoid any unintended deposits into the river. Interestingly, they've come across pieces of that earlier shipwreck while working and have stopped work while archeologists were called in to examine the findings. Included on the downstream side of the new bridge will be a five- meter- wide walkway shared by pedestrians and cyclists, which at the city center side will connect to Mackay City Council's riverside promenade. The work is mostly self- performed, with very little subcontracting. Traffic will be switched over from the old bridge to the new one by early next year, when work will begin on stage two. The project is slated for completion in early 2011. on both ends, and the crew has had to drive piles very close to it, needing to take great care. " We're using vibration monitors; we've had to stabilize the pipe because if damaged, there is no easy way to limit the flow between our project and the treatment plant," says Malowiecki. Golding Contractors NOVEMBER 09 www. bus- ex. com 157 "" Since we have to leave the current two lanes operational while we construct the new lanes, we're working in and around traffic, which makes the construction very linear and relatively lengthy"